STAGE 1 (TRANSMISSION) EMERGENCY

 In

When the minimum required operating reserve level of an electrical utility’s power supply falls below approximately seven percent, a Stage 1 Emergency is called. Under Stage 1, voluntary conservation is called in order to avoid severe conditions, and the amount can vary depending on the type of generation.